Asset Publisher

19th meeting of the CCTF

13 to 14 September 2012

Meeting report

Contact person

Asset Publisher

Search filter :

Resolutions/Recommendations

CCTF Recommendation 1 (2012)

Updates to the list of standard frequencies

DOI : 10.59161/CCTF2012REC1E

CCTF Recommendation 2 (2012)

On improved internet services provided by the BIPM Time Department and their maintenance

DOI : 10.59161/CCTF2012REC2E

CCTF Recommendation 3 (2012)

Regular calculation and publication of rapid UTC (UTCr)

DOI : 10.59161/CCTF2012REC3E

CCTF Recommendation 4 (2012)

Concerning the upgrade and calibration of global navigation satellite systems (GNSS) equipment in the timing laboratories contributing to Coordinated Universal Time (UTC) towards multi-frequency, multi-constellation receiving systems

DOI : 10.59161/CCTF2012REC4E

CCTF Recommendation 5 (2012)

Development of continental-scale optical fibre time and frequency transfer networks and support to studies of improved methods for intercontinental clock comparison

DOI : 10.59161/CCTF2012REC5E

CCTF Recommendation 6 (2012)

A contribution from the Consultative Committee on Time and Frequency (CCTF) on achieving a continuous reference time scale

DOI : 10.59161/CCTF2012REC6E

Publications

Working documents

CCTF/2012-00

Schedule of meetings

F. Arias (BIPM)

Sun Aug 19 00:00:00 GMT 2012

CCTF/2012-01

Agenda of the 19th meeting of the CCTF

L. Erard (CIPM), F. Arias (CCTF)

Sun Aug 19 00:00:00 GMT 2012

CCTF/2012-02

VNIIFTRI report on activities

VNIIFTRI

Sun Aug 19 00:00:00 GMT 2012

CCTF/2012-03

Revised versions of Guidelines 2 and 3

CCTF WG MRA

Mon Aug 20 00:00:00 GMT 2012

CCTF/2012-04

Uncertainty in Frequency

G. Panfilo (BIPM), F. Cordara (CCTF WG MRA)

Mon Aug 20 00:00:00 GMT 2012

CCTF/2012-05

The prediction uncertainty

G. Panfilo (BIPM), F. Cordara (CCTF WG MRA)

Mon Aug 20 00:00:00 GMT 2012

CCTF/2012-06

USNO report on activities

USNO

Mon Aug 20 00:00:00 GMT 2012

CCTF/2012-07

NICT report on activities

NICT

Mon Aug 20 00:00:00 GMT 2012

CCTF/2012-08

Proposal of recommendation, corrected version 12/09/2012

D. Matsakis (USNO)

Mon Aug 20 00:00:00 GMT 2012

CCTF/2012-09

Proposal for a new structure of CCTF WGs and chairs

CCTF WG on Strategic Planning

Mon Aug 20 00:00:00 GMT 2012

CCTF/2012-10

Letter from the ITU General Secretary to the Director of the BIPM on the future of UTC

ITU

Mon Aug 20 00:00:00 GMT 2012

CCTF/2012-11

Report of the CCTF WG on the MRA

F. Cordara

Tue Aug 28 00:00:00 GMT 2012

CCTF/2012-12

Report of the CGGTTS

J. Levine (NIST)

Tue Aug 28 00:00:00 GMT 2012

CCTF/2012-13

NMIJ report on activities

NMIJ

Tue Aug 28 00:00:00 GMT 2012

CCTF/2012-14

Resolution 1 of the 24th CGPM: On the possible future revision of the International System of Units, the SI

24th CGPM

Wed Aug 29 00:00:00 GMT 2012

CCTF/2012-15

PTB report on activities

PTB

Wed Aug 29 00:00:00 GMT 2012

CCTF/2012-16

SIM report on activities

M. Lopez (CENAM)

Sun Sep 02 00:00:00 GMT 2012

CCTF/2012-17

CENAM report on activities

CENAM

Sun Sep 02 00:00:00 GMT 2012

CCTF/2012-18

LNE-SYRTE report on activities

LNE-SYRTE

Mon Sep 03 00:00:00 GMT 2012

CCTF/2012-19

Report of the CCFT WG on TWSTFT

D. Piester (PTB)

Tue Sep 04 00:00:00 GMT 2012

CCTF/2012-20

ORB report on activities

ORB

Tue Sep 04 00:00:00 GMT 2012

CCTF/2012-21

Programme of work of the BIPM Time Department for 2013-2015

F. Arias

Tue Sep 04 00:00:00 GMT 2012

CCTF/2012-22

TL report on activities

TL

Tue Sep 04 00:00:00 GMT 2012

CCTF/2012-23

KRISS report on activities

KRISS

Tue Sep 04 00:00:00 GMT 2012

CCTF/2012-24

UTCr: a rapid realization of UTC

BIPM

Thu Sep 06 00:00:00 GMT 2012

CCTF/2012-25

Terms of reference of the CCTF WG on TWSTFT (proposed)

D. Piester (PTB)

Thu Sep 06 00:00:00 GMT 2012

CCTF/2012-26

SP report on activities

SP

Thu Sep 06 00:00:00 GMT 2012

CCTF/2012-27

Report on SP-MIKES fibre link

K. Jaldehag (SP)

Thu Sep 06 00:00:00 GMT 2012

CCTF/2012-28

NPL report on activities

NPL

Thu Sep 06 00:00:00 GMT 2012

CCTF/2012-29

METAS report on activities

METAS

Thu Sep 06 00:00:00 GMT 2012

CCTF/2012-30

NMISA report on activities

NMISA

Fri Sep 07 00:00:00 GMT 2012

CCTF/2012-31

INRIM report on activities

INRIM

Fri Sep 07 00:00:00 GMT 2012

CCTF/2012-32

NPLI report on activities

NPLI

Fri Sep 07 00:00:00 GMT 2012

CCTF/2012-33

NIST report on activities

NIST

Fri Sep 07 00:00:00 GMT 2012

CCTF/2012-34

NRC report on activities

NRC

Fri Sep 07 00:00:00 GMT 2012

CCTF/2012-35

Proposal of recommendation - Development of continental-scale fibre optical time and frequency networks...

CCFT WG on ATFT

Mon Sep 10 00:00:00 GMT 2012

CCTF/2012-36

VSL report on activities

VSL

Mon Sep 10 00:00:00 GMT 2012

CCTF/2012-37

NIM report on activities

NIM

Tue Sep 11 00:00:00 GMT 2012

CCTF/2012-38

APMP report on activities

Huang-Tien Lin and Chia-Shu Liao (TL)

Tue Sep 11 00:00:00 GMT 2012

CCTF/2012-39

ROA report on activities

ROA

Tue Sep 11 00:00:00 GMT 2012

CCTF/2012-40

Proposal of reccomendation on the upgrade and calibration of GNSS equipment in the timing laboratories

CGGTTS

Wed Sep 12 00:00:00 GMT 2012

CCTF/2012-41

Report of the CCTF WG on TAI

P. Tavella (INRIM)

Wed Sep 12 00:00:00 GMT 2012

CCTF/2012-42

Report of the CCTF WG on PFS

T. Parker (NIST)

Thu Sep 13 00:00:00 GMT 2012

CCTF/2012-43

Report of the CCTF WG ATFT

P. Tuckey (LNE-SYRTE)

Thu Sep 13 00:00:00 GMT 2012

CCTF/2012-44

IGS Clock products Working Group

K. Senior (IGS)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-45

Report on activities - BIPM Time Department

F. Arias (BIPM)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-46

Multi-technique combination for UTC/TAI time and frequency transfer

Z. Jiang, G. Petit, W. Lewandowski (BIPM)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-47

Improvements in ALGOS

G. Panfilo (BIPM)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-48

Frequency standards in TAI and realization of TT(BIPM)

G. Petit, G. Panfilo (BIPM)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-49

UTCr - A rapid realization of UTC

BIPM Time Department

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-50

GNSS processing techniques: review of some topics for the coming years

G. Petit (BIPM)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-51

GPS and GLONASS P3 combination

A. Harmegnies (BIPM), P. Defraigne (ORB)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-52

Report of the CCTF WG on the MRA (presentation)

F. Cordara (INRIM)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-53

The uncertainty in frequency and the prediction uncertainty

G. Panfilo (BIPM)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-54

Report of the IERS Conventions Centre

G. Petit (BIPM), B. Luzum (USNO)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-55

Time Department programme of work and budget 2013-2015 and plans for 2016-2019

F. Arias (BIPM)

Sat Oct 06 00:00:00 GMT 2012

CCTF/2012-56

The future of the UTC time scale

R. Beard (ITU-R)

Sun Oct 07 00:00:00 GMT 2012

CCTF/2012-57

Possible redefinition of UTC

F. Arias (BIPM)

Sun Oct 07 00:00:00 GMT 2012

CCTF/2012-58

Summary elements for consideration - Coordinated Universal Time (UTC)

B. Nelson

Sun Oct 07 00:00:00 GMT 2012

CCTF/2012-59

Report of the CCL-CCTF Frequency Standards Working Group

F. Riehle (PTB), P. Gill (NPL)

Sun Oct 07 00:00:00 GMT 2012

CCTF logo

Asset Publisher