BIPM.RI(I)-K4, EURAMET.RI(I)-K4.1, EURAMET.RI(I)-K4.2, APMP.RI(I)-K4 and EURAMET.RI(I)-K4.3

MEASURAND                 Absorbed dose to water

Radiation quality        Co-60 beam

 

Degrees of equivalence represented by Di = (xI -1) and its expanded uncertainty Ui at a 95 % level of confidence, both expressed in mGy/Gy.

Absorbed dose to water
Di  (mGy/Gy)
Participating institutes

Data older than 15 years are no longer included for degrees of equivalence

BIPM.RI(I)-K4, EURAMET.RI(I)-K4.1, EURAMET.RI(I)-K4.2, APMP.RI(I)-K4 and EURAMET.RI(I)-K4.3

MEASURAND                 Absorbed dose to water

Radiation quality        Co-60 beam

 

Degrees of equivalence represented by Di = (xI -1) and its expanded uncertainty Ui at a 95 % level of confidence, both expressed in mGy/Gy.

LABi Di Uneg,i Upos,i
mGy/Gy
mGy/Gy
mGy/Gy
ENEA -0.1 8.8
VNIIFTRI -1.4 8.6
LNE-LNHB -1.9 7.8
METAS 1.1 10.4
PTB -1.3 7.6
NPL 2.3 14.2
VSL -3.0 10
BEV -0.3 8.2
GUM 3.0 7.0
ARPANSA -0.5 10.2
NRC -0.5 6.8
BFKH -3.5 9.0
NIM 2.7 7.2
KRISS -1.4 7.6
NMIJ -4.8 8.0
SCK-CEN -1.5 15.5
CIEMAT 2.3 11.1
VINS 0.0 14.4
Nuc. Malaysia -1.7 14.2
AECS-NRLM 0.7 24.0
NMISA -0.1 11.4
BRMD, DMSc 1.8 10.8
BARC 3.2 11.0
PTKMR-BATAN 2.3 18.8
NRSL/INER -1.9 8.2
NIS 0.3 14.2
SSM 1.2 9.1
DSA 2.2 9.7
STUK 2.4 9.1
DTU 1.6 11.5
CIEMAT 0.2 10.7
IAEA -0.2 10.3
Participating institutes
BIPM.RI(I)-K4
EURAMET.RI(I)-K4.1
EURAMET.RI(I)-K4.2
APMP.RI(I)-K4
EURAMET.RI(I)-K4.3

Data older than 15 years are no longer included for degrees of equivalence

SIM.RI(I)-K4.2019
Metrology area, Sub-field Ionizing Radiation, Section I (x and gamma rays, electrons)
Description Absorbed dose to water
Time of measurements 2019 - 2021
Status Measurements in progress
References

SIM.RI(I)-K4 Registration and progress form

SIM.RI(I)-K4 Technical Protocol

Measurand Absorbed dose to water
Parameters Co-60 beam
Transfer device Ionization chambers: waterproof Farmer-type
Comparison type Key Comparison
Consultative Committee CCRI (Consultative Committee for Ionizing Radiation)
Conducted by SIM (Inter-American Metrology System)
RMO Internal Identifier SIM.RI(I).K1-K4
Comments
 
Pilot institute NRC
National Research Council
Canada
Contact person John Paul Archambault

+1-613-993-2715x252
First Name Last Name
wwww@ww.www +356719836 Institute 1 Institute 1 Khmelnitskiy
Pilot laboratory
NRC

National Research Council, Canada, SIM

CNEA

National Commission of Atomic Energy, Argentina, SIM

ININ

Instituto Nacional de Investigaciones Nucleares, Mexico, SIM

LNMRI/IRD

Laboratorio Nacional de Metrologia das Radiacoes Ionizantes, IRD, Brazil, SIM

MIEM-LSMRI

Laboratorios Tecnogestión - Ministerio de Industria, Energía y Minería, Uruguay, SIM

NIST

National Institute of Standards and Technology, United States, SIM

BIPM.RI(I)-K4,  EURAMET.RI(I)-K4.1, EURAMET.RI(I)-K4.2, APMP.RI(I)-K4 and EURAMET.RI(I)-K4.3

 

MEASURAND                 Absorbed dose to water

Radiation quality        Co-60 beam

 

BIPM.RI(I)-K4

The key comparison reference value is the BIPM evaluation of absrobed dose to water.

The degree of equivalence of each laboratory i with respect to the key comparison reference value is given by a pair of terms both expressed in mGy/Gy:
the relative difference Di = (xi - 1) x 1000 and Ui, its expanded uncertainty (k = 2), with Ui = 2ui.

When required, the degree of equivalence between two laboratories i and j can be evaluated by a pair of terms both expressed in mGy/Gy:

Dij = Di - Dj  and Uij  , its expanded uncertainty (k = 2). The approximation for Uij is explained in section 5 of the Final Report.

 

Linking EURAMET.RI(I)-K4.1 to BIPM.RI(I)-K4

The linking of EURAMET.RI(I)-K4.1 to BIPM.RI(I)-K4 was made via BEV, LNE-LNHB and METAS, having participated in both comparisons.

The degree of equivalence of each laboratory i participant in EURAMET.RI(I)-K4.1 with respect to the key comparison reference value is given by a pair of terms both expressed in mGy/Gy: Di = (xi - 1) x 1000 and Ui, its expanded uncertainty (k = 2).

 

Linking EURAMET.RI(I)-K4.2 to BIPM.RI(I)-K4

The linking of EURAMET.RI(I)-K4.2 to BIPM.RI(I)-K4 was made via BEV having participated in both comparisons.

The degree of equivalence of each laboratory i participant in EURAMET.RI(I)-K4.2 with respect to the key comparison reference value is given by a pair of terms both expressed in mGy/Gy: Di = (xi - 1) x 1000 and Ui, its expanded uncertainty (k = 2).

 

Linking APMP.RI(I)-K4 to BIPM.RI(I)-K4

The linking of APMP.RI(I)-K4 to BIPM.RI(I)-K4 was made via ARPANSA, NMIJ-AIST and PTB having participated in both comparisons.

The degree of equivalence of each laboratory i participant in APMP.RI(I)-K4 with respect to the key comparison reference value is given by a pair of terms both expressed in mGy/Gy: Di = (xi - 1) x 1000 and Ui, its expanded uncertainty (k = 2).

Linking EURAMET.RI(I)-K4.3 to BIPM.RI(I)-K4

VSL provides the link between the key comparison BIPM.RI(I)-K4 and EURAMET.RI(I)-K4.3, having participated in both comparisons. The linking process is described in Section 2.4 of the EURAMET.RI(I)-K4.3 Final Report.

The degree of equivalence of each laboratory i participant in EURAMET.RI(I)-K4.3 with respect to the key comparison reference value is given by a pair of terms both expressed in mGy/Gy: Di = (xi - 1) x 1000 and Ui, its expanded uncertainty (k = 2).

BIPM.RI(I)-K4, SIM.RI(I)-K4, EUROMET.RI(I)-K4, EURAMET.RI(I)-K4.1, EURAMET.RI(I)-K4.2, APMP.RI(I)-K4 and EURAMET.RI(I)-K4.3

 

MEASURAND                 Absorbed dose to water

Radiation quality        Co-60 beam

 

BIPM.RI(I)-K4 - Laboratory measurements

xi : ratio of the measurement made at the BIPM by laboratory i to that of the BIPM
ui : combined standard uncertainty of the ratio xi

  Labi xi ui year of measurement
  ENEA 0.9999 0.0044 2007
  VNIIFTRI 0.9986 0.0043 2009
  LNE-LNHB 0.9981 0.0039 2013
  METAS 1.0011 0.0052 2013
  PTB 0.9987 0.0038 2015
  NPL 1.0023 0.0071 2017
  VSL 0.9970 0.0048 2017
  BEV 0.9997 0.0041 2020
  GUM 1.0030 0.0035 2020
  ARPANSA 0.9995 0.0051 2020
  NRC 0.9995 0.0034 2020
  BFKH 0.9965 0.0045 2021
  NIM 1.0027 0.0036 2021
  KRISS 0.9986 0.0038 2022
  NMIJ 0.9952 0.0040 2022

 

SIM.RI(I)-K4 - Laboratory measurements

xi : result of measurement carried out at laboratory i converted to absorbed dose through the NRC measurements at the BIPM (See SIM.RI(I)-K4 Final Report)
ui : combined standard uncertainty of xi

 

EUROMET.RI(I)-K4 - Laboratory measurements

See EUROMET.RI(I)-K4 Final Report.

 

EURAMET.RI(I)-K4.1 - Laboratory measurements

xi : result of measurement carried out at laboratory i  linked via BEV.
ui : combined standard uncertainty of xi

  Labi xi ui year of measurement
  METAS 0.9980 0.0063 2013 - 2015
  BEV 1.0011 0.0057 2013 - 2015
  LNE-LNHB 0.9977 0.0052 2013 - 2015
  SCK-CEN 0.9985 0.0078 2013 - 2015
  VSL 0.9952 0.0058 2013 - 2015
  CIEMAT 1.0023 0.0056 2013 - 2015

 

EURAMET.RI(I)-K4.2 - Laboratory measurements

xi : result of measurement carried out at laboratory i  linked via BEV, LNE-LNHB and METAS.
ui : combined standard uncertainty of xi

  Labi xi ui year of measurement
  VINS 1.0000 0.0072 2017

 

APMP.RI(I)-K4 - Laboratory measurements

xi : result of measurement carried out at laboratory i  linked via ARPANSA, NMIJ-AIST and PTB.
ui : combined standard uncertainty of xi

  Labi xi ui year of measurement
  Nuc. Malaysia 0.9983 0.0071 2009
  AECS 1.0007 0.0115 2009
  KRISS 0.9967 0.0040 2009
  NMISA 0.9999 0.0057 2009
  DMSc 1.0018 0.0054 2010
  BARC 1.0032 0.0055 2010
  NIM 1.0010 0.0050 2010
  BATAN 1.0023 0.0094 2010
  INER 0.9981 0.0041 2010
  NIS 1.0003 0.0071 2010

 

EURAMET.RI(I)-K4.3 - Laboratory measurements

The measurement results are listed in Table 5 of the EURAMET.RI(I)-K4.3 Final Report.